Notes on draw reviews and observed progress.

  1. Field notes: the week the schedule said framing and the flyover said foundations

    A field-notes look at the gap between a GC's schedule narrative and what a weekly flyover shows on the slab.

  2. Excusable delay vs. contractor-caused delay: what the draw table needs to see

    How owners and lenders tell a weather day from a contractor-caused delay, and what documentation actually holds up against a time-extension claim.

  3. Observed vs. billed percent complete: what the gap means for a draw

    Billed percent complete comes from the contractor's pay app. Observed percent complete comes from the site. Here's what the gap between them tells a lender.

  4. What a change order log tells a lender about the schedule

    What a change order log is, how approved vs. pending entries change a draw review, and why lenders check it against the schedule.

  5. Field notes: the week the parking lot filled up but nothing on the schedule moved

    Why a busy lot and a stalled schedule line aren't the same thing, and what weekly observed progress catches that activity alone doesn't.

  6. What is a two-week lookahead schedule, and why it matters at draw time

    What a two-week lookahead schedule is, why owners and lenders should read it at draw time, and how it exposes slippage a monthly site walk can miss.

  7. How often should a lender refresh site photos between draws?

    Most construction loans get site photos once a month, at the draw. Here's why that cadence leaves lenders blind for weeks at a time.

  8. What is a progress variance in a draw file, and why lenders ask for it

    A plain explanation of progress variance in a construction loan draw file: what it measures, how lenders use it, and why observed percent complete matters.

  9. Field notes: the week the framing crew fell behind and the pay app still said on schedule

    A field-notes look at how a framing crew's slow week disappeared into a pay app that still read on schedule, and what closes that gap.

  10. How to reconcile a GC's pay application against drone progress photos

    A step-by-step way for owners and lenders to check a GC's claimed percent-complete against weekly drone photos before signing a draw.

  11. How to verify stored materials before approving a draw

    How owners and lenders verify stored materials affidavits and site evidence before approving a draw, for on-site and off-site stored materials line items.

  12. What a conditional lien waiver holds up in a draw package

    A plain explanation of conditional vs. unconditional lien waivers and why the conditional kind can stall a draw before funds move.

  13. Holdback vs retainage: what's the difference on a construction draw?

    Holdback and retainage both hold back money from a contractor, but they protect different parties on different timelines. Here's the line.

  14. How to read an S-curve on a construction loan draw

    A plain-language walkthrough of the S-curve in a draw package: what the planned and actual lines mean, and where the gap matters.

  15. Early signs of schedule slippage before the next draw request

    How float erodes between schedule updates, the field signs that show up before a draw request, and why a weekly observed record catches it first.

  16. How to read a G702 and G703 pay application

    A line-by-line look at the AIA G702 and G703 forms: what each column means and where the contractor's percent-complete number comes from.

  17. Percent complete by cost vs. percent complete by schedule

    Cost-based and schedule-based percent complete measure different things on a draw. Here's why they diverge and how owners reconcile the two.

  18. What is a schedule of values in a construction draw?

    A plain explanation of what a schedule of values is, how its line items work, and what it means for each draw request you review.