The contractor's percent complete, and what the drone saw.
A weekly drone capture measured against your schedule of values, delivered as a progress map you can lay beside the pay application before the draw goes out.
- GSD
- UAV / <10 cm
- Cadence
- Weekly
- Platform
- Drone / crewed aircraft
- Spectral
- RGB
Where a draw review runs out of ground
The pay application arrives with a percent complete on every line of the schedule of values. You check it against invoices, lien waivers and change orders, then walk the site once around the draw date and take photos. Framing, roofing and site work all have to be judged from wherever you can stand, on that one day. A roof is a number on a page from the ground.
So you sign off on a percentage you mostly believe, the lender funds against it, and if a line was front-loaded you learn about it draws later, when the money for the work left is short.

One draw review, step by step
AReading the percent column
The pay application and site walkThe G703 shows the contractor's percent complete for each line. You test it against invoices, lien waivers and what you saw on the walk.
With Construction ProgressEach schedule-of-values line that shows above grade gets an observed percent complete beside the claimed one, with the as-of date of the flight it came from.
Still yoursLines with nothing to see from the air, such as permits, insurance and general conditions, and any work below grade or inside the building.
BThe site walk
The pay application and site walkOne visit near the draw date, covering whatever you can reach and photograph.
With Construction ProgressA capture of the whole site every week, at the same coverage each time, so the record does not depend on what you could see that day.
Still yoursBeing on site for quality, safety and anything that needs a person in the room.
CThe photo set in the draw file
The pay application and site walkA dated folder of photos, hard to line up from one month to the next.
With Construction ProgressA progress map layer for each week. Lay this week over last and see what was added.
DSpotting slip against the schedule
The pay application and site walkThe contractor's updated schedule and what comes up at the progress meeting.
With Construction ProgressSchedule variance by milestone, observed against planned.
Still yoursDeciding what a variance means for the loan and raising it with the contractor.
EThe draw memo
The pay application and site walkA written narrative and photos, with the percent complete as your own judgment.
With Construction ProgressA CSV tied to the schedule of values that you can attach to the memo, with the as-of date of the last capture.
Still yoursThe recommendation to fund, hold or reduce, and the lien waivers, change orders and retainage arithmetic.
What arrives each week
- CSVRowA
Observed percent complete
One row per schedule-of-values line that shows above grade, with the observed percent, the claimed percent you supply, and the as-of date. Weekly. It replaces the guesswork in the first ledger row and goes straight into the draw memo.
- TableRowD
Schedule variance by milestone
Observed against planned for each milestone in your schedule, weekly. It answers the fourth row of the comparison.
- Georeferenced mapRowC
Progress map layer
The site-wide picture with completed work tinted over the plan, one layer per week. It takes the place of the photo folder.
- CSVRowE
Export tied to your schedule of values
The same figures keyed to your schedule of values line numbers so they sit next to the G703 without retyping.
How it works
- Setup
Before the first flight
You send the site boundary and the schedule of values. We match the lines to what a drone can see and tell you which lines have nothing to measure.
- Weeks 1-4
Each week
A drone or aerial flight covers the site. If weather blocks it, the capture moves to the next clear window and the as-of date says so.
- After each flight
Measured and compared
Progress is measured against your schedule and set beside the last capture.
- Draw date
Before the draw goes out
You receive the latest observed percent, the variance table and the map. Open them next to the pay application.
- Next month
Next draw
The record carries forward. The following month starts from the last as-of date rather than from a blank folder.
Limits
These are the things the old walk still does better.

- Above grade only
- The drone sees what is visible from the air. Foundations already backfilled, interior finishes and MEP rough-in are not measured.
- Weather moves the date
- A weekly capture is a target. Rain, wind or a delayed flight pushes it to the next clear window, and a draw may fall between two flights.
- Some lines have nothing to see
- General conditions, insurance, bonds and fees show on the schedule of values with no visible progress. Those stay on your desk.
- Stored materials
- Materials in a warehouse or laydown yard off the site boundary are outside the capture.
- An observed data point, not a certification
- The observed percent feeds your own draw review. It carries no contractual or legal weight and does not replace your judgment or the architect's certification.
- Under 10 cm is a floor
- That is the ground sample distance of the capture. Small fixtures, fine finishes and hairline defects will not show.
Who it's for
Switch if you
- Review pay applications for an owner or a lender and want a percent complete you did not get from the contractor.
- Walk the site once a month and know the draw depends on what you could see that day.
- Need the observed figure keyed to the schedule of values, not another photo folder.
Stay with the pay application and site walk if you
- Need interior, below-grade or MEP progress measured.
- Want a legal certification of completion or a forecast completion date.
- Are looking for a replacement for the contractor's own pay application.
Questions from draw reviewers
Does this replace the contractor's own reporting?
No. It sits beside the pay application as a second reading of the same lines.
What if it rains or the flight slips?
Capture moves to the next clear window, and each figure carries its as-of date. Weekly cadence leaves room for a short slip.
Can it see inside the building or below grade?
No. This is above-grade, visible-progress capture only.
Does the percent complete carry contractual weight?
No. It is an observed data point that feeds your own draw review.
Can you match our schedule of values line items?
Yes. Your schedule of values is the reference the observed progress is measured against, and the export uses your line numbers.
How do we check it against what we see on site?
Compare the map and the CSV with your own walk and photos from the same week. If a line looks wrong, tell us and we will look at that capture again.
Who owns the imagery, and can the contractor see it?
Terms for the imagery and derived files are set in the contract before work starts. Who receives the weekly package is your decision.
How is it priced?
Each site is scoped and quoted on its own, based on the site and the length of the project. You get a written scope to take through your own approval.
Send the schedule of values and the site boundary.
Ask about your schedule in the chat, or start with one.